Home  

• 11 KV Direct Supply from TNEB

• 2 Nos. of raising mains for each wing with one as a standby with change over facility.

• Distribution inside the building to various floors through raising mains with 2 nos. tap offs on each floor.

• Change over on the LT side in the main panels.

• Under ground diesel storage tank for a total of 16 hrs of running of all DG sets.

• 100 % backup through 8 (7+1) nos. of
1500 KVA - 415 V DG sets with 1 no as stand by.

• DG sets will be in acoustic containers located in the open area.