11 KV Direct Supply from TNEB
• 2 Nos. of raising mains for each wing with one
as a standby with change over facility.
• Distribution inside the building to various
floors through raising mains with 2 nos. tap offs on
each floor.
• Change over on the LT side in the main panels.
• Under ground diesel storage tank for a total
of 16 hrs of running of all DG sets.
• 100 % backup through 8 (7+1) nos. of
1500 KVA - 415 V DG sets with 1 no as stand by.
• DG sets will be in acoustic containers located
in the open area.
|